Nuurstei Project

Nuurstei Project

Nuurstei provides a very complementary project to Ovoot, being located adjacent to the planned road to be constructed from Ovoot to Murun. It is capable of producing a high quality mid-volatile hard coking coal. Work on developing Nuurstei will resume once Ovoot is in production.

Key Facts: Nuurstei

OwnershipAspire has a 90% interest in Nuurstei
StatusScoping Study complete
Expected productMid-vol hard coking coal
Mining LicenseMV-020941 valid until October 2047 (extendable twice by 20yr periods)
Total JORC Resource13 Mt
LocationApproximately 10km from Murun, the administrative centre of Khuvsgul aimag (province)
Next StepsFurther work on Nuurstei has been deferred until after bringing the much larger scale Ovoot
Coking Coal Project into production

Coal Resource and Coal Reserve Estimates

Drilling completed to date has resulted in identification of an estimated 12.85 Mt of Total JORC (2012) compliant Coal Resources. Summary of this Coal Resource estimate within the Nuurstei mining license is as follows:

CategoryTotal (Mt)
Measured0.0
Indicated4.75
Inferred8.10
Total12.85

Indicative Washed Coal Specification

Coal quality analysis on core samples retrieved from Nuurstei has shown that quality hard coking coal is present, and that there is likely the ability to produce a washed product of low ash, low sulphur, high G index and good fluidity.